Thursday, April 11, 2013

FINAL CONSTRUCTION SCHEDULE


Thursday 4/11/13
12:30-2:30 Gabby and Amy go to Lowe’s and get finish for
 metal
11-2:30 Greg, Bryan, Josh, and Brad make wood run
2:30-9:50 Greg, Bryan, Josh, and Brad finish support structure and
 attach crossbeams
2:30-3:30 Amy and Christy figures out slat measurements
3:30-5:30 Amy, Christy, cut slats down and drill holes
3:30-7:30, Natalie, Sarah, Christy, Rose cut hinges and adjust panels for
 them
5:30-7:30 Natalie and Gabby prime metal and paint

Friday 4/12/13
11-5:30 Greg, Bryan, Josh, and Brad finish support structure, attach
 crossbeams, and interior supports
5:30-6:30 Amy and Alena “attach” metal slats
6:30-7:30 Natalie, Sarah, Christy, Rose Refine panels, and route
7:30-10 Josh and Brad put finish on bottom structure wood, and add
 finish to wood of panels
7:30-8:30 Amy and Christy Cut edge bands for panels and drill holes
8:30-10:30 Natalie, Alena, Mecca Treat edge bands for panels

Saturday 4/13/13
12:00-4:00 EVERYONE ASSEMBLE BENCH!!!
12:00-midnight EVERYONE FINISH OTHER JOBS AND DO ART
HISTORY!!!!

Sunday 4/14/13
CONSTRUCTION DOCUMENTS meet at 2 pm- 8 pm
*DO ART HISTORY BEFORE THIS TIME. Only excuse is your scheduled CNC time.

Monday 4/15/13
CONSTRUCTION DOCUMENTS meet at 11 after Art History

Tuesday 4/16/13
PRESENTATION PREPARATION starting at 2:30


OTHER JOBS
Greg: Finish Stuckeman and Finances
Amanda: Full presentation, Rhino model of bench and forum
Brad: Make sure everyone’s doing the shit they’re supposed to
Bryan: Finish Stuckeman and be the construction manager
Gabby: Finish Stuckeman and be the construction manager
Amy: Finances
Veronica: Railings for forum model and little model to fit on forum and
 documentation
Josh: Stuckeman Model and Documentation
Natalie: Make sure everyone’s doing the shit they’re supposed to
Alena: BLOG and presentation and rhino
Rose: Railing of forum model, Documentation
Mecca: Railing of forum model and documentation
Sarah: Forum model stairs and documentation
Christy: Forum model stairs

ANY QUESTIONS, COMMENTS, BITCHING ABOUT CONFLICTS GOES TO NATALIE







No comments:

Post a Comment

Note: Only a member of this blog may post a comment.